P.M.T.S. (Predetermined Motion Time Systems) include

A.
M.T.M. (Method Time Measurement)
B.
W.F.S. (Work Factor Systems)
C.
B.M.T.S. (Basic Motion Time Study)
D.
All of these
Answer

Answer: Option D

Solution

Answer: Option D
Solution:
A predetermined motion time system (PMTS) is frequently used to perform Labor Minute Costing in order to set piece-rates, wage-rates and/or incentives in labor (labour) oriented industries by quantifying the amount of time required to perform specific tasks under defined conditions.