Vidyalelo
Mining Engineering · Q384

Introduction to Mining Engineering

Engineering and GATE · Mining Engineering · question 384

Q384

Prior to installation of a long wall equipment at face, the face is to be developed by Road headers in

A.
retreating long wall mining method
Answer
B.
advance long wall mining method
C.
both advancing and retreating method
D.
conventional longwall

Answer: Option A

Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board