Vidyalelo
Civil Engineering · Q2

Estimating And Costing

Engineering and GATE · Civil Engineering · question 2

Q2

Size, capacity and materials need be specified for

A.
Bib-cocks
B.
Stop-cocks
C.
Ball valves
D.
All the above
Answer

Answer: Option D

Solution

Answer: Option D