The pessimistic Time Estimate is

A.
maximum possible time it could take to accomplish the job
Answer
B.
minimum possible time it could take to accomplish the job
C.
the total time estimate of the critical path
D.
none of the above

Answer: Option A

Solution

Answer: Option A