Vidyalelo
Electrical Engineering · Q24

Transmission And Distribution

Engineering and GATE · Electrical Engineering · question 24

Q24

Which of the following methods is used for laying of underground cables?

A.
Direct laying
B.
Draw-in-system
C.
Solid system
D.
All of the above
Answer

Answer: Option D

Solution

Answer: Option D
No explanation is given for this question Let's Discuss on Board