Q96
Which tunneling method was adopted in variable geology for the Brenner Base Tunnel?
A.
Cut and cover
B.
NATM (New Austrian Tunneling Method)
AnswerC.
Pipe jacking
D.
Sequential excavation
Answer: Option B
Solution
Answer: Option B
Solution:
NATM was adopted in the Brenner Base Tunnel due to its flexibility in adjusting support systems to varying geological conditions.