Block overlap in two aspect signalling system is ________ meters.
Select an option to see the answer and solution.
Block overlap in multiple aspect signalling system is ________ meters.
Select an option to see the answer and solution.
Distance between outer and home signals on a double line is ________ meters.
Select an option to see the answer and solution.
The turning out time off BD SPL. During day is ________ minutes
A. 30
B. 20
C. 50
D. None of these
Select an option to see the answer and solution.
The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
A. 25
B. 15
C. 20
D. None of these
Select an option to see the answer and solution.
For disconnection of points S&T official must issue form ________
A. T/351
B. T/A 351
C. T/B 351
D. None of these
Select an option to see the answer and solution.
Whenever new signal is put into use, signal sighting committee submits its joint report on
A. T/105B
B. T/106B
C. T/104C
D. T/102B
Select an option to see the answer and solution.
Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A. 10
B. 20
C. 30
D. None of these
Select an option to see the answer and solution.
Loco and traffic running staff are eligible for ________ hours rest at Head quarters after running duty of less than 08 hours.
A. 06 Hours
B. 10 Hours
C. 12 Hours
D. None of these
Select an option to see the answer and solution.
If the points are set for main line, point indicator gives ________ light in the night.
A. red
B. Green
C. Yellow
D. White
Select an option to see the answer and solution.
________ bogies can be attached in rear of SLR of Mail/Express train.
Select an option to see the answer and solution.
What is the means of EA in WTT?
A. Extra allowances
B. Engineering allowances
C. Extra recovery time
D. None of these
Select an option to see the answer and solution.
Sand hump is a substitute to ________ and also a means of isolation.
A. Signal
B. Signal overlap
C. Over signal
D. None of these
Select an option to see the answer and solution.
What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A. 30 meters
B. 3 meters
C. 27 meters
D. 100 meters
Select an option to see the answer and solution.
Motor Trolly can follow another motor trolly during
A. Day and Night
B. Day only
C. Day and Night clear weather
D. None of these
Select an option to see the answer and solution.
If the driver does not receive all right signal from the guard, he must call by giving.
A. Two sharp whistles
B. One long one short
C. On long
D. None of these
Select an option to see the answer and solution.
Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A. Fixed stop signal
B. Hand Signal
C. Call-on Signal
D. None of these
Select an option to see the answer and solution.
When a stream engine is running tender foremost the speed shall not exceed ________.
A. 40 kmph
B. 20 kmph
C. 30 kmph
D. None of these
Select an option to see the answer and solution.
The maximum distance covered by a patrol man should not normally exceed
A. 10 KM a day
B. 12 KM
C. 15 KM
D. None of these
Select an option to see the answer and solution.
Flasher light is of ________ colour.
A. Red
B. Amber
C. Green
D. None of these
Select an option to see the answer and solution.