Vidyalelo
General Knowledge · all questions

Practice
practice.

Practice every MCQ with options. Use Show answers when you want the correct option and solution.

863

Questions

13/44

Page

Pick an option on a question to see the right answer and solution.

Block overlap in two aspect signalling system is ________ meters.

Select an option to see the answer and solution.

Block overlap in multiple aspect signalling system is ________ meters.

Select an option to see the answer and solution.

Distance between outer and home signals on a double line is ________ meters.

Select an option to see the answer and solution.

The turning out time off BD SPL. During day is ________ minutes

Select an option to see the answer and solution.

The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.

Select an option to see the answer and solution.

For disconnection of points S&T official must issue form ________

Select an option to see the answer and solution.

Whenever new signal is put into use, signal sighting committee submits its joint report on

Select an option to see the answer and solution.

Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner

Select an option to see the answer and solution.

Loco and traffic running staff are eligible for ________ hours rest at Head quarters after running duty of less than 08 hours.

Select an option to see the answer and solution.

If the points are set for main line, point indicator gives ________ light in the night.

Select an option to see the answer and solution.

________ bogies can be attached in rear of SLR of Mail/Express train.

Select an option to see the answer and solution.

What is the means of EA in WTT?

Select an option to see the answer and solution.

Sand hump is a substitute to ________ and also a means of isolation.

Select an option to see the answer and solution.

What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?

Select an option to see the answer and solution.

Motor Trolly can follow another motor trolly during

Select an option to see the answer and solution.

If the driver does not receive all right signal from the guard, he must call by giving.

Select an option to see the answer and solution.

Last stop signal means the ________ of a station controlling the entry of trains into the next block section.

Select an option to see the answer and solution.

When a stream engine is running tender foremost the speed shall not exceed ________.

Select an option to see the answer and solution.

The maximum distance covered by a patrol man should not normally exceed

Select an option to see the answer and solution.

Flasher light is of ________ colour.

Select an option to see the answer and solution.