In English garden wall bond

Select an option to see the answer and solution.

To obtain good bonding in brick masonry

Select an option to see the answer and solution.

The bearing capacity of piles is determined by

Select an option to see the answer and solution.

For effective drainage, the finished surface of flat roof should have a minimum slope of

Select an option to see the answer and solution.

For plastering the exposed brick walls, the cement sand mortar should be

Select an option to see the answer and solution.

Sum of tread and rise must lie between

Select an option to see the answer and solution.

The number of steps in a flight generally should not be less than

Select an option to see the answer and solution.

For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than

Select an option to see the answer and solution.

The taper of precast concrete pile should not be more than

Select an option to see the answer and solution.

The Auger boring method is not suitable for

Select an option to see the answer and solution.

The ceiling height of a building is

Select an option to see the answer and solution.

To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act

Select an option to see the answer and solution.

The vertical faces of a door opening which support frame of the door, are

Select an option to see the answer and solution.

In verandah (corridor) floors outward slope is

Select an option to see the answer and solution.

The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known

Select an option to see the answer and solution.

The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called

Select an option to see the answer and solution.

The horizontal timber piece provided at the apex of a roof truss which supports the common rafter is called

Select an option to see the answer and solution.

The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is

Select an option to see the answer and solution.

The wedge shaped bricks forming an arch ring, are called

Select an option to see the answer and solution.

The entrained concrete is used in lining walls and roofs for making