Irrigation Engineering
practice.

Practice every MCQ with options. Use Show answers when you want the correct option and solution.

268

Questions

1/14

Page

Pick an option on a question to see the right answer and solution.

Finally formed berms in canals are provided for

Select an option to see the answer and solution.

Canals constructed for draining off water from water logged areas, are known

Select an option to see the answer and solution.

A hydroelectric scheme operating under a head of 80 m will be classified as

Select an option to see the answer and solution.

Irrigation water having the concentration of Na++, Ca++ and Mg++ as 20, 3 and 1 Milli equivalent per litre respectively will be classified as

Select an option to see the answer and solution.

If d1 is the depth of cutting, d2 is the height of the bank from bed level r2 : 1 and r1 : 1 are the slopes in filling and cutting respectively, the horizontal distance n between the bed and bank, is

Select an option to see the answer and solution.

A minimum of 90 cm free board is provided if the discharge in the canal is between

Select an option to see the answer and solution.

If the irrigation efficiency is 80%, conveyance losses are 20% and the actual depth of watering is 16 cm, the depth of water required at the canal outlet, is

Select an option to see the answer and solution.

The difference in level between the top of a bank and supply level in a canal, is called

Select an option to see the answer and solution.

The structure constructed to allow drainage water to flow under pressure through an inverted syphon below a canal, is called

Select an option to see the answer and solution.

The downstream expansion head of a guide bank is extended to subtend an angle at the centre, equal to

Select an option to see the answer and solution.

The uplift pressure on a dam can be controlled by
i) constructing cutoff under upstream face
ii) constructing drainage channels bet-ween the dam and its foundation
iii) by pressure grouting in foundation
The corret answer is

Select an option to see the answer and solution.

If the risk of a flood occurring in the next 10 years is accepted to 10%, then the return period for design should be

Select an option to see the answer and solution.

The width of a meander belt is the transverse distance between

Select an option to see the answer and solution.

Pick up the correct statement from the following:

Select an option to see the answer and solution.

The ratio of average values of shear stresses produced on the bed and the banks of a channel due to flowing water is

Select an option to see the answer and solution.

The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be

Select an option to see the answer and solution.

The main function of a diversion head works of a canal from a river, is

Select an option to see the answer and solution.

The amount of irrigation water required to meet the evapotranspiration needs of the crop during its full growth is called

Select an option to see the answer and solution.

For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.)

Select an option to see the answer and solution.

The intensity of irrigation means

Select an option to see the answer and solution.