Consider a case where the system is unavailable and cannot deliver its services to users. What type of failure is being described here?
A. Loss of service
B. Incorrect service delivery
C. System/data corruption
D. None of the mentioned
Select an option to see the answer and solution.
Open source development involves making the source code of a system publicly available.
Select an option to see the answer and solution.
Purpose of process is to deliver software
A. in time
B. with acceptable quality
C. that is cost efficient
D. both in time & with acceptable quality
Select an option to see the answer and solution.
Which one of the following is not an actor in JAD sessions ?
A. User
B. Tester
C. Scribe
D. Sponsor
Select an option to see the answer and solution.
Which of the following statement(s) is true about interaction diagrams?
A. Interaction diagrams are at their best when they deal with one main design flow and not multiple variants that can happen
B. Interaction diagrams are good at designing part or all of one use case's functionality across multiple objects
C. Interaction diagrams allow the analyst to show iteration and conditional execution for messaging between objects
D. All of the mentioned
Select an option to see the answer and solution.
What is used to determine the recommended degree of rigor with which the software process should be applied on a project?
A. Degree of Rigor
B. Adaptation criteria
C. Task Set
D. Both degree of Rigor and adaptation criteria
Select an option to see the answer and solution.
Which of the following is not a type of CASE tool?
A. Lower
B. Classic
C. Real
D. Middle
Select an option to see the answer and solution.
The . . . . . . . . is connected to servers (typically powerful workstations or PCs) that play a dual role.
A. Database
B. Software
C. Hardware
D. None of the mentioned
Select an option to see the answer and solution.
Which of the following option is not tracked by configuration management tools?
A. Tracking of change proposals
B. Storing versions of system components
C. Tracking the releases of system versions to customers
D. None of the mentioned
Select an option to see the answer and solution.
When does the testing process stops?
A. When resources (time and budget) are over
B. When some coverage is reached
C. When quality criterion is reached
D. Testing never ends
Select an option to see the answer and solution.
Which of the following is not a diagram studied in Requirement Analysis ?
A. Use Cases
B. Entity Relationship Diagram
C. State Transition Diagram
D. Activity Diagram
Select an option to see the answer and solution.
What is the major drawback of CORE ?
A. Requirements are comprehensive
B. NFRs are not given enough importance
C. Role of analyst is passive
D. All of the mentioned
Select an option to see the answer and solution.
Which one of the following is not a step of requirement engineering?
A. elicitation
B. design
C. analysis
D. documentation
Select an option to see the answer and solution.
All fault-tolerant techniques rely on
A. Integrity
B. Dependability
C. Redundancy
D. None of the mentioned
Select an option to see the answer and solution.
Which of the following is an essential principle of an architecture?
A. Consistency
B. Reliability
C. Scalability
D. All of the mentioned
Select an option to see the answer and solution.
Which of the following is not an activity of Structured Analysis (SA) ?
A. Functional decomposition
B. Transformation of a textual problem description into a graphic model
C. All the functions represented in the DFD are mapped to a module structure
D. All of the mentioned
Select an option to see the answer and solution.
The . . . . . . . . specifies the behavior of a system or a part of a system.
A. Yellow box
B. Clear box
C. White box
D. Black box
Select an option to see the answer and solution.
To ensure that a given root definition is rigorous and comprehensive, The Lancaster team proposed several criteria that are summarized in the mnemonic CATWOE in Soft Systems Methodology (SSM).Which of the following alphabet is representing an entirely different meaning to SSM ?
A. C - Customer
B. A - Actor
C. T - Transformation
D. E - ER Model
Select an option to see the answer and solution.
Which two models doesn't allow defining requirements early in the cycle?
A. Waterfall & RAD
B. Prototyping & Spiral
C. Prototyping & RAD
D. Waterfall & Spiral
Select an option to see the answer and solution.
. . . . . . . . defines the properties of a data object and take on one of the three different characteristics.
A. data object
B. attributes
C. relationships
D. data object and attributes
Select an option to see the answer and solution.