Which of the following term is best defined by the statement: "There will be a change of organizational management with different priorities."?
A. Staff turnover
B. Technology change
C. Management change
D. Product competition
Select an option to see the answer and solution.
A directed arc or line in DFD represents
A. Data Store
B. Data Process
C. Data Flow
D. All of the mentioned
Select an option to see the answer and solution.
. . . . . . . . is a pidgin(simplified version of a language that develops as a means of communication between two or more groups that do not have a language in common)
A. program design language
B. structured English
C. pseudocode
D. all of the mentioned
Select an option to see the answer and solution.
Software project estimation can never be an exact science, but a combination of good historical data and systematic techniques can improve estimation accuracy.
Select an option to see the answer and solution.
How many layers are present in the OO design pyramid?
Select an option to see the answer and solution.
Which of the following does not affect the software quality and organizational performance?
A. Market
B. Product
C. Technology
D. People
Select an option to see the answer and solution.
Which technique is applicable when other projects in the same analogy application domain have been completed?
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson's Law
Select an option to see the answer and solution.
Which of the following is not a use of a CASE tool ?
A. Support structured analysis and design (SA/SD)
B. Maintains the data dictionary
C. Checks whether DFDs are balanced or not
D. It complies with the available system
Select an option to see the answer and solution.
Which of the following type describes application architectures?
A. Transaction processing applications
B. Language processing systems
C. Client management systems
D. Transaction processing applications and Language processing systems
Select an option to see the answer and solution.
Facade pattern couples a subsystem from its clients.
Select an option to see the answer and solution.
Design patterns does not follow the concept of software reuse.
Select an option to see the answer and solution.
Which of the following come under system control?
A. Reconfigure
B. Shutdown
C. Powersave
D. All of the mentioned
Select an option to see the answer and solution.
Which of the following Requirement Elicitation Techniques is applicable to messy, changing and ill-defined problem situations ?
A. Quality Function Deployment (QFD)
B. Prototyping
C. Soft Systems Methodology (SSM)
D. Controlled Requirements Expression (CORE)
Select an option to see the answer and solution.
Which of the following is a common pointwer problem?
A. Data sharing errors
B. Accessing data elements of the wrong type
C. Attempting to use memory areas after freeing them
D. All of the mentioned
Select an option to see the answer and solution.
The average execution time of the power monitor process should be less than
A. 1ms
B. 10ms
C. 100ms
D. none of the mentioned
Select an option to see the answer and solution.
SMI = [Mt - (Fa + Fc + Fd)]/Mt. Here Mt is the number of modules
A. in the current release
B. in the current release that have been changed
C. from the preceding release that were deleted in the current release
D. none of the mentioned
Select an option to see the answer and solution.
The . . . . . . . . of a specification language indicates how the language represents system requirements.
A. semantic domain
B. syntactic domain
C. sequence
D. set
Select an option to see the answer and solution.
What is the first step of requirement elicitation ?
A. Identifying Stakeholder
B. Listing out Requirements
C. Requirements Gathering
D. All of the mentioned
Select an option to see the answer and solution.
How is Incremental Model different from Spiral Model?
A. Progress can be measured for Incremental Model
B. Changing requirements can be accommodated in Incremental Model
C. Users can see the system early in Incremental Model
D. All of the mentioned
Select an option to see the answer and solution.
BPR stands for
A. Business process re-engineering
B. Business product re-engineering
C. Business process requirements
D. None of the mentioned
Select an option to see the answer and solution.