Face along the strike prefarable for stowing in seams dipping more than.

Select an option to see the answer and solution.

The water garland segments provided with outlet hole into which screwed a nipple for . . . . . . . . mm diameter drain pipe

Select an option to see the answer and solution.

For retreating L/W and B. P workings, only suitable method of methane drainage is

Select an option to see the answer and solution.

No. of drills employed in shaft sinking

Select an option to see the answer and solution.

In India coal seams over . . . . . . . . m thick are considered as thick seams.

Select an option to see the answer and solution.

Top most horizon of tertiary succession in Assam is known as

Select an option to see the answer and solution.

How many coal seams belong to Barakar formation

Select an option to see the answer and solution.

Drill rods made of

Select an option to see the answer and solution.

The width of the rooms in room and pillar method may be

Select an option to see the answer and solution.

The tunneling machine employed in hard rock should be

Select an option to see the answer and solution.

The core (dia in mm) size obtained with NX size

Select an option to see the answer and solution.

Match the following:
1. Thickseam Extraction a. Double Unit Face
2. Bord and Pillar Extraction b. Jet Pearcing
3. Longwall Face Development c. Inclined Slicing
4. Hydraulic Mining d. Half Moon

Select an option to see the answer and solution.

The minimum distance between two sections should be if one working at floor and one at top.

Select an option to see the answer and solution.

Depillaring operations conducted from dip to . . . . . . . .

Select an option to see the answer and solution.

Room and pillar mining employed at depth below . . . . . . . . meters.

Select an option to see the answer and solution.

The core sizes whose wire line drilling technique is adopted are for BX holes

Select an option to see the answer and solution.

Barrier in between panels is preferably puncture at 'A' number of places. 'A' is given by

Select an option to see the answer and solution.

Dewatering can be done by using the drill machines like

Select an option to see the answer and solution.

Rock formed by errosion, weathering, transportation and ultimately deposition of pre-existing rock

Select an option to see the answer and solution.

Maximum roof exposure for caving is

Select an option to see the answer and solution.