The face advances towards rise side is possible in longwall, if seam inclination less than.

Select an option to see the answer and solution.

Number of persons required to operate a electric drill machine

Select an option to see the answer and solution.

In horizon mining, the vertical distance between horizon is

Select an option to see the answer and solution.

Cuttings from bottom of holes removed by circulating fluid under pressure called

Select an option to see the answer and solution.

Discontinuity which separate the sid and sima layer of crust is known

Select an option to see the answer and solution.

Upto what gradient the bord and pillar mining adopted without special arrangements.

Select an option to see the answer and solution.

The departure of bore hole, whether vertical (or) inclined, from its course called

Select an option to see the answer and solution.

When the stratas are well stratified sand stone or shales, the local fall will take place within . . . . . . . . hours, after withdrawal of supports.

Select an option to see the answer and solution.

The operation of tracing of broken and lost parts in the hole and withdrawn to the surface

Select an option to see the answer and solution.

The DERDS cut coal is thrown on the AFC by

Select an option to see the answer and solution.

The percentage of recovery in BG method.

Select an option to see the answer and solution.

The walls by which roof over the goaf partially/compleated supported by

Select an option to see the answer and solution.

Bentonite chemical is used for

Select an option to see the answer and solution.

Driving motor HP in thrower conveyar in mechanical stowing.

Select an option to see the answer and solution.

The distance between one room to another room, leaving a small rib in . . . . . . . . meters in room and pillar mining.

Select an option to see the answer and solution.

Crows foot used for removing

Select an option to see the answer and solution.

If the size of the pillar is 30 m × 30 m; the number of stooks done in pillar is

Select an option to see the answer and solution.

Rotory drilling methods are

Select an option to see the answer and solution.

For a seam inclined, 60° steep, 2 m thin the method of goaf control employed.

Select an option to see the answer and solution.

The length of rooms in room and pillar method.