The Chief Inspector may not allow a person unless he holds "A" certificate to act as a Manager of any underground coal mine when the average monthly output is in excess of 2500 t. What is A given by
Notice of intention (or) proposal of exploration for methane presence in any coal seam or abonded coal mines, with an objective to explore the methane, domestic or industrial purpose, manager of mine shall not less than . . . . . . . . months prior to the date of start of such exploration work, give notice in writing in form and method specific by CI for the purpose to the CI and also RI
Dust plan shall be maintained in every mine having working below ground plan on a scale having representative factors of not less than . . . . . . . . clearly, showing by distinctive colours, code letters and numbers.
Whose two or more seams or sections are worked in a mine, the pillars in one seam or section shall as far as practicable be vertically above or below the pillars in the same or other seam or section unless the strate are inclined at an angle of more than . . . . . . . . degree from the horizontal.
If the width of the gallery does not exceed 3 meter, and the depth of the seam not exceeding 60 m, the distance between centre of adjacent pillars shall not be less than . . . . . . . . meters.
Main mechanical ventilator in a mine shall be capable of producing adequate ventilation in a mine or part there of and shall be installed on the surface at a distance of not less than . . . . . . . . meters from the opening of a shaft or incline at any point.
As per CMR 2017 the mine surveyor is supposed to record the facts related to workings which have approached to about' A' meter from the boundary, disused workings or waterlogged workings. 'A' is given by