Vidyalelo
Mining Engineering · Q131

Introduction to Mining Engineering

Engineering and GATE · Mining Engineering · question 131

Q131

Advance supporting of 30 m at both the gate roads is required due to

A.
front abutment pressure
Answer
B.
back abutment pressure
C.
both front and back
D.
yield pressure

Answer: Option A

Solution

Answer: Option A
No explanation is given for this question Let's Discuss on Board