Which of these benefits can be achieved when software is restructured?
A. Higher quality programs
B. Reduced maintenance effort
C. Software easier to test
D. All of the mentioned
Select an option to see the answer and solution.
Software Configuration Management can be administered in several ways. These include
A. A single software configuration management team for the whole organization
B. A separate configuration management team for each project
C. Software Configuration Management distributed among the project members
D. All of the mentioned
Select an option to see the answer and solution.
. . . . . . . . states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics.
A. ISO 9001
B. ISO 9000-4
C. CMM
D. All of the mentioned
Select an option to see the answer and solution.
Much of the information necessary to create a behavioral model can be obtained by observing the external manifestation of the existing
A. candidate keys
B. interface
C. database structure
D. none of the mentioned
Select an option to see the answer and solution.
Which of the following term is best defined by the statement "Notation that can be input directly into a computer-based development system offers significant benefits."?
A. Machine readability
B. Maintainability
C. Structure enforcement
D. Overall simplicity
Select an option to see the answer and solution.
What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss?
A. Risk exposure
B. Risk prioritization
C. Risk analysis
D. All of the mentioned
Select an option to see the answer and solution.
Which model describes the static structure of the system using object classes and their relationships?
A. Sequence model
B. Subsystem model
C. Dynamic model
D. Structural model
Select an option to see the answer and solution.
Which of the following examples is/are models of application architectures?
A. a means of assessing components for reuse
B. a design checklist
C. a vocabulary for talking about types of applications
D. all of the mentioned
Select an option to see the answer and solution.
Which of the following activities may be included in a real-time software design process?
A. Platform selection
B. Timing analysis
C. Process design
D. All of the mentioned
Select an option to see the answer and solution.
Which of the following statements regarding Build & Fix Model is wrong?
A. No room for structured design
B. Code soon becomes unfixable & unchangeable
C. Maintenance is practically not possible
D. It scales up well to large projects
Select an option to see the answer and solution.
hat is a collection of operations that specify a service of a class or component?
A. Use Case
B. Actor
C. Interface
D. Relationship
Select an option to see the answer and solution.
Which tools are used to modify online database systems?
A. Reverse engineering specification tools
B. Code restructuring and analysis tools
C. Test management tools
D. online system re-engineering tools
Select an option to see the answer and solution.
POFOD stands for
A. Possibility of failure of data
B. Probability of failure of data
C. Possibility of failure on demand
D. Probability of failure on demand
Select an option to see the answer and solution.
An example of a system that may use a process pipeline is a high-speed
A. data distributing system
B. data acquisition system
C. data collector system
D. none of the mentioned
Select an option to see the answer and solution.
Which two of the following models will not be able to give the desired outcome if user's participation is not involved?
A. Waterfall & Spiral
B. RAD & Spiral
C. RAD & Waterfall
D. RAD & Prototyping
Select an option to see the answer and solution.
Which model is used during early stages of the system design after the requirements have been established?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
Select an option to see the answer and solution.
Requirements Management is a prerequisite for Quality-Oriented Development.
Select an option to see the answer and solution.
Which analysis is a part of Analysis model of the web engineering process framework?
A. Content Analysis
B. Interaction Analysis
C. Functional Analysis
D. All of the mentioned
Select an option to see the answer and solution.
What are security controls ?
A. Controls that are intended to ensure that attacks are unsuccessful
B. Controls that are intended to detect and repel attacks
C. Controls that are intended to support recovery from problems
D. All of the mentioned
Select an option to see the answer and solution.
The switch to backup power must be completed within a deadline of
A. 50 ms
B. 55 ms
C. 70 ms
D. 100 ms
Select an option to see the answer and solution.