One time measurement unit (TMU) in method time measurement system equals
A. 0.0001 minute
B. 0.0006 minute
C. 0.006 minute
D. 0.001 minute
Select an option to see the answer and solution.
The main object of scientific layout is
A. To produce better quality of product
B. To utilize maximum floor area
C. To minimize production delays
D. All of these
Select an option to see the answer and solution.
The most important function of inventory control is
A. Stock control system
B. To run the stores effectively
C. Technical responsibility for the state of materials
D. All of the above
Select an option to see the answer and solution.
The average time recorded by work study man for an operation is called
A. Standard time
B. Normal time
C. Representative time
D. None of these
Select an option to see the answer and solution.
Merit Rating is the method of determining worth of
A. A job
B. An individual employee
C. A particular division in workshop
D. Machine
Select an option to see the answer and solution.
Which one of the following techniques is used for determining allowances in time study?
A. Acceptance sampling
B. Linear regression
C. Performance rating
D. Work sampling
Select an option to see the answer and solution.
The critical path of a network represents
A. The minimum time required for completion of project
B. The maximum time required for completion of project
C. Maximum cost required for completion of project
D. Minimum cost required for completion of project
Select an option to see the answer and solution.
Job evaluation is the method of determining the
A. Relative worth of jobs
B. Skills required by a worker
C. Contribution of a worker
D. Contribution of a job
Select an option to see the answer and solution.
Merit rating is the method of determining the
A. Relative values of a job
B. Workers performance on a job
C. Worth of a machine
D. Value of overall production
Select an option to see the answer and solution.
Which of the following is independent of sales forecast?
A. Productivity
B. Inventory control
C. Production planning
D. Production control
Select an option to see the answer and solution.
In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches
Select an option to see the answer and solution.
String diagram is used
A. For checking the relative values of various layouts
B. When a group of workers are working at a place
C. Where processes require the operator to be moved from one place to another
D. All of the above
Select an option to see the answer and solution.
In micro-motion study, therblig is described by
A. A symbol
B. An event
C. An activity
D. Standard symbol and colour
Select an option to see the answer and solution.
Work study comprises following main techniques
A. Method study and work measurement
B. Method study and time study
C. Time study and work measurement
D. Method study and job evaluation
Select an option to see the answer and solution.
The main advantage of line organisation, is
A. Effective command and control
B. Defined responsibilities at all levels
C. Rigid discipline in the organisation
D. All of the above
Select an option to see the answer and solution.
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
A. Halsey plan
B. Gantt plan
C. Rowan plan
D. Emerson's efficiency plan
Select an option to see the answer and solution.
In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives in addition to the guaranteed basic pay/wages, is based on:
A. A standard rating system
B. A merit rating system
C. A job evaluation system
D. His individual performance
Select an option to see the answer and solution.
String diagram is used when
A. Team of workers is working at a place
B. Material handling is to be done
C. Idle time is to be reduced
D. All of the above
Select an option to see the answer and solution.
"Travel Charts" are used to
A. Analyze material handling
B. Determine inventory control difficulties
C. Plan material handling procedure and routes
D. All of the above
Select an option to see the answer and solution.
The product layout
A. Lowers overall manufacturing time
B. Requires less space for placing machines
C. Utilizes machine and labour better
D. All of these
Select an option to see the answer and solution.