Which of the following is/are technique(s) of OR?
A. Mathematical technique
B. Replacement technique
C. Sequencing model
D. All of these
Select an option to see the answer and solution.
Match the following.
List-I
List-II
a. TQM promotes
1. Small change
b. Kaizen
2. Continuous improvement
c. Quality circle can solve problem related
3. Employee participation
d. Quality circle benefit to
4. Employee
A. a-3, b-1, c-2, d-4
B. a-1, b-3, c-2, d-4
C. a-3, b-1, c-4, d-2
D. a-3, b-2, c-1, d-4
Select an option to see the answer and solution.
Which of the following are key components of a total quality management system?
A. Individual responsibility, incremental improvement, use of raw data
B. Collective responsibility, continual improvement, use of raw data
C. Group responsibility, staged improvement, knowledge
D. Involves everyone, continual improvement, use of data and knowledge
Select an option to see the answer and solution.
TQM expands on earlier approaches to quality management. Which of the following is ordered correctly from earlier to later ideas?
A. Quality control, Inspection, Quality assurance, Total quality management
B. Inspection, Quality control, Quality assurance, Total quality management
C. Quality assurance, Inspection, Quality control, Total quality management
D. Quality assurance, Quality control, Inspection, Total quality management
Select an option to see the answer and solution.
Production planning is a management function employed for the direction of the manufacturing operations and their coordination with activities of
A. firm
B. plant
C. organisation
D. profit
Select an option to see the answer and solution.
Which of the following sequencing techniques focus on prompt delivery?
A. Customer sequencing
B. Due date sequencing
C. FIFO sequencing
D. SOT sequencing
Select an option to see the answer and solution.
Which one of the following is assumed for timing the activities in PERT network?
A. α distribution
B. β distribution
C. Binomial distribution
D. Erlangen distribution
Select an option to see the answer and solution.
Statement I Operation research is the application of scientific methods to the study of alternatives in a problem situation with a view to providing qualitative basis for arriving at an optimum solution in terms of goal sought.
Statement II Operation research is a quantitative commonsense embracing observation, experiment and reasoning.
A. Statement I is correct, but Statement II is incorrect
B. Both statements are correct
C. Both statements are incorrect
D. Statement II is correct, but Statement I is incorrect
Select an option to see the answer and solution.
Procurement cycle time is time consumed for
A. receiving of raw material
B. inspection of various raw materials
C. inspection of purchased components parts
D. all of the above
Select an option to see the answer and solution.
Match the following.
List-I (ISO Certifications)
List-II (Field)
a. ISO 9003
1. Testing
b. ISO 14001
2. Environment
c. ISO 9000
3. Guidelines for selection
d. ISO 9002
4. Quality assurance in production
e. ISO 9001
5. Production
A. a-1, b-3, c-2, d-4, e-5
B. a-1, b-2, c-3, d-4, e-5
C. a-4, b-2, c-5, d-1, e-3
D. a-5, b-3, c-1, d-2, e-4
Select an option to see the answer and solution.
Match the following.
List-I (Methods)
List-II (Application)
a. SQC
1. Quality control
b. BEP
2. Marginal costing
c. PERT
3. Operational
d. Audit
4. Evaluation
A. a-3, b-1, c-2, d-4
B. a-1, b-2, c-3, d-4
C. a-1, b-4, c-2, d-3
D. a-3, b-2, c-1, d-4
Select an option to see the answer and solution.
Which one of the following is not covered while considering the types of costs involved in quality control?
A. Preventive costs
B. Manufacturing costs
C. Inspection costs
D. Failure costs
Select an option to see the answer and solution.
Objectives of a good plant layout includes
A. higher utilisation of space
B. to improve productivity
C. improved production capacity
D. all of the above
Select an option to see the answer and solution.
Which devices may be used in quality control?
A. Statistics tools
B. Acceptance sampling
C. Control charts
D. All of the above
Select an option to see the answer and solution.
Transportation problem can be solved by
A. North-West comer rule
B. Vogel's approximation method
C. Degenerate solution
D. All of the above
Select an option to see the answer and solution.
Which of the following statement is true?
A. Loading ensures maximum possible utilisation of productive facilities and avoids bottlenecks In production
B. Loading is the process of converting operation schedules into practice
C. Facility loading means loading of facility of work centre and deciding which jobs to be assigned to which work centre
D. All of the above
Select an option to see the answer and solution.
Which statement is true?
A. Scheduling system is used for scheduling when jobs are produced one by one and are different in nature, i.e. for job shop
B. When jobs are produced to order in batches, batch scheduling system is used
C. When large number of items of similar type are produced, i.e. in mass production, mass scheduling is used
D. None of the above
Select an option to see the answer and solution.
Group layout is the type of
A. process layout
B. product layout
C. plant layout
D. matrix layout
Select an option to see the answer and solution.
The collectiveset of tools and techniques used to develop a quality assurance system when business processes show variations, is known as
A. quality assurance process
B. quality management system
C. statistical quality control
D. statistical process control
Select an option to see the answer and solution.
Match the following.
List-I (Example of Therbligs)
List-II (Abbreviations)
a. Assemble
1. A
b. Disassemble
2. St
c. Position
3. DA
d. Select
4. P
A. a-1, b-4, c-3, d-2
B. a-1, b-3, c-4, d-2
C. a-1, b-2, c-3, d-4
D. a-4, b-1, c-3, d-2
Select an option to see the answer and solution.