The support in shrikage stoping is . . . . . . . .

Select an option to see the answer and solution.

If the stoping started on eiqhter side of rise winze connection called . . . . . . . .

Select an option to see the answer and solution.

The stoping method selected, where ore body is thick veins type ore and walls are strong and steeply dipping ore i.e. footwall steeper than angle of repose of broken ore is . . . . . . . .

Select an option to see the answer and solution.

Grizzly is used in ore bin to prevent.

Select an option to see the answer and solution.

Alimak raise climber introduced in India first time in the year . . . . . . . .

Select an option to see the answer and solution.

The method employed, if the ore body is strong steeply dipping with strong host rock.

Select an option to see the answer and solution.

The method of drop raising is an improvement over the method of raising through . . . . . . . .

Select an option to see the answer and solution.

Mineral hoisting in one lift can be done upto the depth not exceeding . . . . . . . . meters.

Select an option to see the answer and solution.

The vertical distance between two levels called as . . . . . . . .

Select an option to see the answer and solution.

Compressibility of sand fill by hydraulic stowing is . . . . . . . .

Select an option to see the answer and solution.

In the form of a square pyramid blasted material of 7368 m3 by volume is accommodated. The height of the pyramid is 2.4 m. Calculate surface area in m2

Select an option to see the answer and solution.

It is the mining method in which masses, panels or blocks of ore are under cut to induce caving, permetting the broken ore to be drawn off below.

Select an option to see the answer and solution.

An arrangement that prevents oversized rock to pass.

Select an option to see the answer and solution.

The method of stoping selected in strong to weak, fairly steep are with weak host rock.

Select an option to see the answer and solution.

The level roadways are dipping at a mild gredient between . . . . . . . .

Select an option to see the answer and solution.

Channel sampling also called . . . . . . . .

Select an option to see the answer and solution.

In cut and fill stope the main purpose of back filling is to . . . . . . . .

Select an option to see the answer and solution.

A small portion of the ore body collected and analysed to estimate the average mineral content of the ore body called . . . . . . . .

Select an option to see the answer and solution.

Stoping is always started on each side of . . . . . . . . direction.

Select an option to see the answer and solution.

Cut and fill stoping can be done by . . . . . . . .

Select an option to see the answer and solution.