If the depth of the shaft exceeds 1000 m but not 1500 m, no winding rope shall be used or continued to use, if its factor of safety is becomes less than . . . . . . . . in metal mines.
Select an option to see the answer and solution.
In cut and fill stoping is done by . . . . . . . .
A. Under hand method
B. Caving method
C. Over hand
D. All the above
Select an option to see the answer and solution.
The method of stoping suitable to extract thick ore body strong ore, stable handling and footwall steeply dipping ore is . . . . . . . .
A. Open stoping
B. Sub level
C. Shrinkage
D. Cut and fill
Select an option to see the answer and solution.
The friable rock in cut and fill method is supported by . . . . . . . .
A. Hydraulic props
B. Cable bolting
C. Roof bolts
D. Stull members
Select an option to see the answer and solution.
The number of persons required for collection of samples in u/g.
Select an option to see the answer and solution.
The sublevel interval does not depend on in metal mines.
A. Capacity of drilling equipment
B. Capacity of loading equipment
C. Strength of rib pillar
D. Strength of wall rock
Select an option to see the answer and solution.
In this method of stoping the large diameter downward parallel holes drilled for blasting.
A. Breast
B. Cut and fill
C. Sub level
D. VCR
Select an option to see the answer and solution.
The channel sampling is applicable in . . . . . . . . to collect samples.
A. Beded deposits
B. Sheet
C. Hardrock
D. All the above
Select an option to see the answer and solution.
In India Alimak Raise climber introduced first time in which mine.
A. Jaduguda uranium mine
B. Mosabani copper mine
C. Lead and Zinc mines jawar
D. None
Select an option to see the answer and solution.
The technique of VRM is different from long hole mining from the point of view off
A. Drilling
B. Blasting
C. Method of working
D. Both A and B
Select an option to see the answer and solution.
Black Iron ore is . . . . . . . .
A. Hematite
B. Magnetite
C. Native iron
D. None
Select an option to see the answer and solution.
Wide stall method procticed by . . . . . . . .
A. Widening the gallery
B. By stooking the pillar
C. Partial extraction
D. None
Select an option to see the answer and solution.
The pillar which is left for support of upper level during extraction called . . . . . . . .
Select an option to see the answer and solution.
Zinc deposit is formed by geological process is . . . . . . . .
A. Hydrothermal
B. Magnetic separation
C. Supergene
D. None
Select an option to see the answer and solution.
Gestation period is . . . . . . . .
A. Lag on ignition period
B. Time to reach break even point
C. The time interval between the commencement of mining and production
D. Time interval between commencement of mining and close of mining
Select an option to see the answer and solution.
Jack hammer assisted with air legs is used in drilling of . . . . . . . .
A. Raises
B. Winzes
C. Drives
D. Shafts
Select an option to see the answer and solution.
The method of stoping selected if the ore is very weak, moderately dipping with very weak host rock.
A. Square set
B. Cut and fill
C. Room and pillar
D. Sub level
Select an option to see the answer and solution.
The method of stoping successfully applied to all dips from horizontal to vertical.
A. Rill stoping
B. Breast stoping
C. Over hand stoping
D. Under hand stoping
Select an option to see the answer and solution.
The interval between two sample places called . . . . . . . .
A. Level interval
B. Channel interval
C. Sampling interval
D. Chip interval
Select an option to see the answer and solution.
In this method blast holes drilled in upward but not in ring fashion.
A. Breast
B. Cut and fill
C. Sub level
D. VCR
Select an option to see the answer and solution.