Distant signal shows ________ light in normal condition in double distant signalling is provided.
A. One Yellow
B. Two yellow
C. Three yellow
D. Four yellow
Select an option to see the answer and solution.
When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
A. Red
B. Green
C. Yellow
D. White
Select an option to see the answer and solution.
When was the nationalization of Indian Railways done?
Select an option to see the answer and solution.
In two aspects areas where shunting in the face of approaching train is not permitted, shunting can be permitted during ________ and under certain conditions (UP to FSS).
A. Day
B. Night
C. Both
D. None of these
Select an option to see the answer and solution.
The form number of authority to proceed without line clear is ________.
A. T/1408
B. T/A1408
C. T/B1408
D. None of these
Select an option to see the answer and solution.
Speed of the last train during ACF on double line is ________ km/h.
A. 25/10/Walking
B. 20/10/Walking
C. 20/15/Walking
D. None of these
Select an option to see the answer and solution.
Wagon with livestock shall be attached ________ position from engine on a goods train.
A. First
B. Second
C. Third
D. None of these
Select an option to see the answer and solution.
Cotton in closed wagon shall be attached ________ position from engine on a goods train.
A. First
B. Second
C. Third
D. None of these
Select an option to see the answer and solution.
Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A. First
B. Second
C. Third
D. None of these
Select an option to see the answer and solution.
To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
A. 25/10 km/h
B. 20/10 km/h
C. 15/10 km/h
D. None of these
Select an option to see the answer and solution.
When ISMD attached train is allowed to run through on PF line the speed must be
A. 5 kmph
B. 8 kmph
C. 10 kmph
D. None of these
Select an option to see the answer and solution.
Which authority shall be issued to pass a starter signal during advanced starter single is failed and starter is interlocked with Ad. Starter at a station equipped with single line token less block?
A. T-369(3b)
B. PLCT
C. Memo + Hand Signal
D. Starter should be taken off
Select an option to see the answer and solution.
During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
A. 270 meters
B. 90 meters
C. 400 meters
D. None of these
Select an option to see the answer and solution.
Competency certificate of the gateman of interlocked engineering gate is issued by
A. SSE/P.way
B. SSE/Sig.
C. SSE/C & W
D. None of these
Select an option to see the answer and solution.
Competency certificate of the gateman of interlocked engineering gate is signed by
A. SSE/P.way
B. SSE/Sig.
C. Both
D. None of these
Select an option to see the answer and solution.
Staff of ________ department shall protect the material train while working in block section.
A. Operation
B. C & W
C. Engineering
D. None of these
Select an option to see the answer and solution.
Hand shunting speed is ________
A. 5 kmph
B. 10 kmph
C. 8 kmph
D. None of these
Select an option to see the answer and solution.
During power failure in automatic block section, on which authority relief engine will proceed?
A. TA-912
B. TB-912
C. TC-912
D. TD-912
Select an option to see the answer and solution.
Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
A. 10
B. 12
C. 06
D. None of these
Select an option to see the answer and solution.
Intermediate Block home will be provided only on ________ Line.
A. Single
B. Double
C. Triple
D. None of these
Select an option to see the answer and solution.