Form number of disconnection and reconnection is ________.

Select an option to see the answer and solution.

when form T/D 912 is issued the driver shall not exceed the speed

Select an option to see the answer and solution.

Shunting speed of 5 box wagons is ________ km/h.

Select an option to see the answer and solution.

When the train is stopped at FSS for more than ________ minutes, the Driver must send his assistant to station after consulting with guard.

Select an option to see the answer and solution.

What is the maximum speed over facing point in non-interlocked station?

Select an option to see the answer and solution.

What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?

Select an option to see the answer and solution.

What is the length of North-Eastern Frontier Railway (NFR)?

Select an option to see the answer and solution.

What is shunting order number?

Select an option to see the answer and solution.

The speed of Motor Trolly over points and crossings is

Select an option to see the answer and solution.

At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph

Select an option to see the answer and solution.

On double line, when a running line is blocked by stabled load , the point to be set against are

Select an option to see the answer and solution.

After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.

Select an option to see the answer and solution.

After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.

Select an option to see the answer and solution.

The speed of engine movement from traffic yard to loco and loco to traffic yard is

Select an option to see the answer and solution.

What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?

Select an option to see the answer and solution.

What will be the maximum speed of B-Class ODC in Broad guage?

Select an option to see the answer and solution.

What will be the speed of a train running through from station without brake van provoded with Tail lamp?

Select an option to see the answer and solution.

In case of accident, siren is repeated at an interval of ________ minutes.

Select an option to see the answer and solution.

During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.

Select an option to see the answer and solution.

Length of a BG ICF Coach is