Modified lower quadrant signaling may be introduced only with section of

Select an option to see the answer and solution.

Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.

Select an option to see the answer and solution.

In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?

Select an option to see the answer and solution.

When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.

Select an option to see the answer and solution.

While ordering ART/MRV each siren shall be sounded for ________ seconds.

Select an option to see the answer and solution.

While cancelling ART/MRV, siren shall be sounded for ________ seconds.

Select an option to see the answer and solution.

During TFC in double line which authority to serve the driver for train operation?

Select an option to see the answer and solution.

How many systems of working in Indian Railways for train operation?

Select an option to see the answer and solution.

Caution indication board will be provided at ________ meters from the bridge or vulnerable places.

Select an option to see the answer and solution.

Single line working inforce on double line.

Select an option to see the answer and solution.

Trolley caution order no is ________.

Select an option to see the answer and solution.

Depot in-charge is responsible to test the detonators once in ________.

Select an option to see the answer and solution.

Signal sighting committee shall submit its report on form ________.

Select an option to see the answer and solution.

Sounding of 5 hooters means ________.

Select an option to see the answer and solution.

Sounding of 4 hooters means ________.

Select an option to see the answer and solution.

After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?

Select an option to see the answer and solution.

SCOR maintains ________ register when serious accident occurs.

Select an option to see the answer and solution.

Water over track is 90 mm.

Select an option to see the answer and solution.

Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.

Select an option to see the answer and solution.

If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.

Select an option to see the answer and solution.