Vidyalelo
Civil Engineering · all questions

Estimating And Costing
practice.

Practice every MCQ with options. Use Show answers when you want the correct option and solution.

95

Questions

3/5

Page

Pick an option on a question to see the right answer and solution.

If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is

Select an option to see the answer and solution.

The most reliable estimate is

Select an option to see the answer and solution.

The main factor to be considered while preparing a detailed estimate, is

Select an option to see the answer and solution.

The order of booking dimensions is

Select an option to see the answer and solution.

The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is
Estimating and Costing mcq question image

Select an option to see the answer and solution.

The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

Select an option to see the answer and solution.

Pick up the correct statement regarding the centre line method of estimating a building

Select an option to see the answer and solution.

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

Select an option to see the answer and solution.

For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is

Select an option to see the answer and solution.

The measurement is not made in square meters in case of

Select an option to see the answer and solution.

The brick work is measured in sq metre, in case of

Select an option to see the answer and solution.

According to Indian Standards Institute, the actual size of modular bricks is

Select an option to see the answer and solution.

The brick work is not measured in cu m in case of

Select an option to see the answer and solution.

Berms are provided in canals if these are

Select an option to see the answer and solution.

While estimating a reinforced cement structure, the omitted cover of concrete is assumed

Select an option to see the answer and solution.

Pick up the item of work not included in the plinth area estimate

Select an option to see the answer and solution.

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2 : 1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

Select an option to see the answer and solution.

Pick up the correct statement from the following:

Select an option to see the answer and solution.

Pick up the correct statement from the following:

Select an option to see the answer and solution.

Pick up the incorrect statement from the following:

Select an option to see the answer and solution.