For the construction of buildings, the subheads of the estimate are

Select an option to see the answer and solution.

The damp proof course (D.P.C.) is measured in

Select an option to see the answer and solution.

The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended

Select an option to see the answer and solution.

The area of a sloping surface of a protective embankment of mean height ‘d’, side slopes S : 1 and length ‘L’ is

Select an option to see the answer and solution.

The detention period in a septic tank is assumed

Select an option to see the answer and solution.

Carpet area does not include the area of

Select an option to see the answer and solution.

While estimating the qualities for the construction of a building, the correct metric unit is

Select an option to see the answer and solution.

The volume is measured correct to the nearest

Select an option to see the answer and solution.

The area is measured correct to the nearest

Select an option to see the answer and solution.

While preparing a detailed estimate

Select an option to see the answer and solution.

The plinth area of a building not includes

Select an option to see the answer and solution.

In the mid-section formula

Select an option to see the answer and solution.

The inspection pit or chamber is a manhole provided in a base drainage system

Select an option to see the answer and solution.

The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
Estimating and Costing mcq question image

Select an option to see the answer and solution.

Anti-siphonage pipe is connected to

Select an option to see the answer and solution.

The 'centre line method' is specially adopted for estimating

Select an option to see the answer and solution.

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

Select an option to see the answer and solution.

According to ISI method of measurement, the order of the sequence is

Select an option to see the answer and solution.

The rate of an item of work depends on

Select an option to see the answer and solution.

The cross-sections for a highway is taken at

Select an option to see the answer and solution.