High pressure grouting is generally restored for concreting in the lining if the rock strata is:

Select an option to see the answer and solution.

The cut of a tunnel face is shown in given figure. This is called
Tunnel Engineering mcq question image

Select an option to see the answer and solution.

The following operations are required for tunnelling in rocky terrain:
1.Removing the foul gases
2.Marking the tunnel profile
3.Setting up and drilling
4.Checking misfire
5.Mucking
The correct sequence is:

Select an option to see the answer and solution.

The length of the needle beam used in needle beam method of tunnelling is usually

Select an option to see the answer and solution.

Railway tunnels are generally

Select an option to see the answer and solution.

The method of draining in the tunnels, is generally known as

Select an option to see the answer and solution.

In the wooded bulk-head, used for mucking in steep grade tunnels,

Select an option to see the answer and solution.

Ribs are used for strengthening and stiffening the liner plate for tunnels of diameter greater than

Select an option to see the answer and solution.

For B.G. single track railway, the height of the tunnel above top of rails should be

Select an option to see the answer and solution.

A good blast with a good yield is obtained if the cut hole is

Select an option to see the answer and solution.

For initial surveys of tunnels, the following activities are involved:
1.Marking portal point with concrete pillars on the ground
2.Marking tunnel obligatory points on the topographical maps
3.Preliminary setting of the tunnel on the topographical Survey of India maps
4.Driving lines between the fixed obligatory points
The correct sequence of the activities is:

Select an option to see the answer and solution.

In Belgium method of tunnelling

Select an option to see the answer and solution.

The advantages of providing a pair of tunnels as compared to only one large highway tunnel is:

Select an option to see the answer and solution.

Which one of the following methods is adopted for permanent drainage of tunnels?

Select an option to see the answer and solution.

What is the correct sequence of the following events of construction of a shaft in rock?
1) Drilling and blasting
ii) Timbering
iii) Pumping
iv) Mucking
Select the correct answer

Select an option to see the answer and solution.

Which one of the following is a component of a shield for tunneling?

Select an option to see the answer and solution.

The correct sequence of drilling equipment for increasing size of holes in tunnels is

Select an option to see the answer and solution.

The difference of heights of the tunnels above rail tops of BG and MG tracks is kept

Select an option to see the answer and solution.

For hauling muck from the tunnel, the following type of muck-car is used:

Select an option to see the answer and solution.

For B.G. single track, the section of the tunnel must have a width

Select an option to see the answer and solution.