Construction Planning And Management
practice.

Practice every MCQ with options. Use Show answers when you want the correct option and solution.

158

Questions

8/8

Page

Pick an option on a question to see the right answer and solution.

Frequency distribution curves

Select an option to see the answer and solution.

Economic saving of time results by crashing

Select an option to see the answer and solution.

If the output of a drag-line for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120% of optimum depth of cut will be

Select an option to see the answer and solution.

A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution of this unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor can exert without slipping is

Select an option to see the answer and solution.

Critical path method

Select an option to see the answer and solution.

The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as

Select an option to see the answer and solution.

If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be

Select an option to see the answer and solution.

The direct cost of a project with respect to normal time is

Select an option to see the answer and solution.

Whenever an activity has zero total float, then

Select an option to see the answer and solution.

While filling the tender for any work, the contractor considers

Select an option to see the answer and solution.

Railway projects are treated as

Select an option to see the answer and solution.

If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is

Select an option to see the answer and solution.

Construction team means

Select an option to see the answer and solution.

Assertion (A): Activity 57 is critical.
Reason (R): Earliest finish time and latest finish time for events 57 are same

Select an option to see the answer and solution.

The time which results in the least possible construction cost of an activity, is known as

Select an option to see the answer and solution.

The area under the Beta distribution curve is divided into two equal parts by

Select an option to see the answer and solution.

The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a factor approximately equal to

Select an option to see the answer and solution.

Which one of the following is not an excavating and moving type of equipment?

Select an option to see the answer and solution.